1. Define the supply-restoration task
An automatic transfer switch is part of a supply-restoration system. Before selecting one, define which circuits must regain power, which loads can tolerate interruption and what the generator must supply after transfer. Identify motors, electronic loads and any UPS-supported equipment. The electrical distribution and operating sequence should describe the same load boundary; a generator capacity and an ATS current rating alone do not define the complete task.
Attach the same single-line diagram and proposed operating sequence to both equipment enquiries. Identify the parties supplying the generator, ATS and site installation, and assign source monitoring, start commands, switching, protection and commissioning. In each offer, mark the interfaces and work as included, supplied by another party or still unresolved. If one package provides only a start contact while the agreed sequence also needs source-status or switch-position feedback, ask who supplies the remaining functions and wiring. Close those gaps before comparing the complete installed scope.
State whether the project concerns one generator and one normal source, several transfer points or a wider system. Confirm the supply voltage, frequency, phase arrangement, earthing design and prospective fault conditions with the responsible electrical designer. More complicated source arrangements require their own logic and protection review. Keep the approved source arrangement consistent across the generator, ATS and site drawings.
2. Understand what open transition means
Open transition disconnects the load from one source before connecting it to the other. This break-before-make sequence introduces an interruption. Its purpose is different from closed transition, which can briefly connect sources together under controlled conditions. Do not describe an open-transition ATS as providing uninterrupted power or assume that it permits parallel operation with the utility.
The switch movement is only one part of the restoration timeline. Source-failure recognition, any start delay, engine starting, acceptable generator voltage and frequency, transfer permission and load restoration can all affect the process. Settings and equipment differ. Define the project’s required outcome and ask for the applicable sequence; do not substitute a single catalogue switching time for the complete loss-of-supply interval.
Also review the return to the normal source. The system may require a stability check and an agreed return delay before transferring back, followed by generator cooldown according to its controller configuration. Define what should happen if the normal source becomes unacceptable again during that process. The sequence should be reviewed against the loads and operating requirements, not copied from another installation.
ASCO explanation of transfer-switch transition modes
3. Separate the start request from permission to carry load
A remote-start request tells the generator control system that operation is required. It does not by itself prove that electrical output is ready for the load. Define the command type, contact or communication interface, control supply and configured input function. Both suppliers should confirm the same interpretation, including how the request is removed and which operating mode allows automatic response.
Define generator availability separately. Identify who measures voltage and frequency and how acceptable-source status becomes permission to transfer. An engine-running indication is not necessarily the same as an acceptable electrical source. If the design uses ready, available, common alarm or fail-to-start signals, document exactly what each one means and which component generates it.
The DSE7320 MKII, for example, combines auto-mains-failure functions with source monitoring and configurable inputs and outputs. For your quotation, identify the controller actually offered and request the configured input and output functions needed by the agreed sequence. Confirm the transfer equipment as a separate supply item. An automatic-start description alone leaves both the interface and the ATS scope unresolved.
DSE7320 MKII manufacturer functions and documentation
4. Agree switching commands, feedback and interlocks
Assign the switching commands to a defined controller or transfer mechanism. Identify the feedback needed to establish actual source-switch positions, including any intermediate or unavailable state relevant to the equipment. A command to close and confirmation that a device has closed are different events. The control narrative should show what happens when expected feedback does not arrive.
Specify the interlocking arrangement that prevents unintended source connection. Ask the switchgear supplier to identify the mechanical and electrical interlocks on the applicable drawings, then have the electrical designer check them against the agreed source arrangement. Include manual operation and maintenance modes in that review. Record which supplier provides each interlock and which checks demonstrate its intended function during commissioning. The order should reference the accepted drawing revision and any required project approvals, rather than relying on a front-panel diagram or an equipment photograph.
| Interface | Question to resolve | Evidence to request |
|---|---|---|
| Start request | Who issues it and what input function receives it? | Approved control interface schedule |
| Source acceptance | Who checks voltage, frequency and any other required condition? | Functional sequence and configured settings |
| Switching feedback | Which signals confirm actual device positions? | Switchgear diagram and feedback definitions |
| Failure response | What happens if starting or transfer does not complete? | Alarm and fallback sequence |
| Neutral and earthing | Which conductors are switched and where are bonds located? | Designer-approved system arrangement |
Keep communication links distinct from the essential control functions. If monitoring uses a network, establish what the system does when that link is unavailable. Confirm the required local operation, indication and fault reporting with the equipment manufacturers. Decide which information is for the operator and which signal is used directly by the control sequence.
5. Give neutral switching and earthing a design owner
A solid neutral and a switched neutral are different arrangements. In a solid-neutral design, the relevant neutral connection remains continuous; a switched-neutral design uses an additional switching pole. The correct selection depends on the distribution, source bonding and protection design. It cannot be decided solely from the number of phase conductors or from the ATS current rating.
Ask the electrical designer to identify neutral-to-earth bonding points, protective conductors and the intended fault-current paths in each operating state. Coordinate ground-fault or residual-current protection where applicable. The transfer equipment and generator must match that approved arrangement. Do not change neutral links or bonding merely to make two generic supplier diagrams appear similar.
Use ASCO’s descriptions of solid, switched and overlapping-neutral arrangements to identify the options under discussion, then ask the electrical designer to select and document the arrangement for the actual distribution and local requirements. Put the agreed pole arrangement, neutral connections and design responsibility in the purchase record. Have the generator and ATS suppliers reference that same record in their drawings and offers so that a difference in neutral scope is resolved before ordering.
ASCO guidance on transfer-switch neutral configurations
6. Match the power path and the installed environment
The selected transfer equipment must suit the intended voltage, frequency, current and load characteristics. Ask the responsible designer and switchgear supplier to confirm the applicable short-circuit withstand or closing rating and coordination with protective devices. A current rating by itself does not settle fault performance, cable terminations, installation conditions or the suitability of the complete assembly.
Review cable access, conductor sizes, terminal space, enclosure location and the service clearance required by the actual equipment. Confirm who supplies the outgoing protection, control cabling, auxiliary supply and communications. Identify any environment or access constraint that changes the enclosure or installation. Request the assembly drawing and equipment data that confirm the ordered current rating, enclosure protection and included components.
Where motors retain residual voltage after disconnection, or electronic loads have particular input requirements, review the transition method and timing with their suppliers. A delayed open transition may answer a different need from a rapid break-before-make operation. Sensitive circuits that require continuity may need a suitable UPS or another project-specific arrangement; the ATS does not itself supply stored energy.
Review generator load and starting requirements
7. Specify the failure cases and commissioning evidence
Write the expected response to source failure, unsuccessful generator starting, unacceptable generator output and failed transfer. Include the operator’s indication and any agreed manual recovery route. Define which conditions inhibit switching and which require intervention. Put the agreed responses into the control specification and commissioning procedure, so the person setting the controller and the person checking the installation work from the same sequence.
Agree commissioning responsibilities across the generator, ATS, distribution and load suppliers. A generator factory run does not verify the complete site transfer sequence. Ask which records will demonstrate sensing, starting, source acceptance, interlocks, transfer, return and alarms in the installed arrangement. Identify the test conditions and acceptance criteria before work starts, including the people authorised to approve the result.
Retain the final diagrams, interface schedule, configuration versions and agreed settings with the installation record. Record any changes made during commissioning and update the operator’s instructions. The person maintaining the system should be able to identify its actual control logic without reconstructing the purchase correspondence. Review later equipment replacements against these records before assuming that the original settings remain appropriate.
8. Questions buyers ask about ATS arrangements
Does an automatic-start generator automatically include an ATS?
No. Automatic starting capability and power-transfer equipment are separate items to confirm. Ask the quotation to identify the controller, transfer equipment, associated accessories and site work. A photograph, remote-start terminal or general product description does not establish that a complete ATS package is standard supply.
Who issues the start request if both packages have mains-failure functions?
Agree one source-monitoring and start-command strategy in the interface schedule. Have both suppliers confirm how the selected ATS and generator controller will be configured to follow it, including the failure response. Two products offering automatic functions do not, by themselves, establish which device takes responsibility for the sequence.
What needs review when a controller is replaced after commissioning?
Compare the replacement against the approved drawings and settings record, including sensing, input and output functions, switch feedback and the transfer sequence. Ask the responsible suppliers which settings can be retained and which checks or tests must be repeated. Update the installation record after acceptance so the next technician can identify the controller and configuration actually in service.
Prepare your generator and ATS enquiry
Send GOODWIND the destination, single-line diagram, load information, voltage, frequency and required restoration outcome. Include the proposed ATS, neutral and earthing design, available control interfaces and the parties responsible for site work. Mark missing information and ask each supplier to state the assumptions behind its offer. Use the agreed sequence and interface schedule to confirm generator configuration, transfer equipment, wiring and commissioning scope before accepting the order.