GOODWIND Shares SGS, CE and EAC Documents for Diesel Generator Buyers

The three ISO certificates SGS issued to our Yangzhou factory cover the assembly of diesel generator sets from 10 to 2,400 kW. For a particular machine, start with the model on the quotation. SF-C24, for example, appears in the annex to our Machinery Directive attestation. GW-Y688 appears on our EAC declaration.

Read the certificates and model lists

The manufacturer appears on these documents under our company name, Yangzhou Shunfeng Power Generation Equipment Co., Ltd. Open any page below to read the full-size copy.

SGS certification at the Yangzhou assembly plant

SGS United Kingdom Ltd issued a separate certificate for each of our three management systems. Each scan shows the scope of certification, the certificate number and the dates printed on the document.

  • Quality management. ISO 9001:2015, certificate CN26/00003555. The printed end date is 24 August 2029.
  • Environmental management. ISO 14001:2015, certificate CN26/00004418. The printed end date is 30 April 2029.
  • Occupational health and safety management. ISO 45001:2018, certificate CN26/00004420. The printed end date is 14 September 2029.

For a supplier audit, the scope printed beneath the standard number gives the activity SGS certified. For a tender that specifies electrical performance, the relevant evidence may be an engine data sheet, an alternator performance curve or a test report for the individual set.

Red generator enclosures beneath signs for final assembly stations 1, 2 and 3, next to two marked test bays
Final assembly stations at our Yangzhou factory. The test bays are on the right.

If you sell under your own brand, use the factory name printed on the certificate when registering us as your supplier. Include the site, scope and certificate number. Continued validity depends on satisfactory surveillance audits. You can look up the numbers above in the SGS Certified Client Directory.

The CE attestation and its model annex

Our UDEM Machinery Directive Attestation of Conformity carries the number M.2024.206.C110132. It records a technical file review and audit for diesel generator sets with reference to Machinery Directive 2006/42/EC, Annex VIII. The document gives a registration date of 22 November 2024 and a printed expiry date of 21 November 2029.

The model field on the first page points to the annex. For example, a buyer reviewing an SF-C24 can find that exact designation on the second page and match the attestation number across both pages. If a quotation uses a different designation, send it to us for a model check. For an EU order, ask for the manufacturer’s signed declaration of conformity for the machine being supplied. The European Union’s guidance on CE marking explains the manufacturer’s responsibility for that declaration.

Keep both UDEM pages with the quotation. The first identifies the manufacturer, product, directive and standards. The annex lists the models. On a private-label order, put our factory model code beside the one your customer will see. The first time you use that pairing, send us the nameplate artwork before it goes into production.

Diesel generator models on the EAC declaration

The Eurasian Economic Union declaration names our Yangzhou company as the manufacturer, GOODWIND as the trademark and ООО «ТЕСТКО РУС» as the applicant. Its list includes GW-Y688, GW-S900 and GW-B500N, among other models. Keep the full model designation, including any suffix, when comparing it with a quotation or nameplate.

The registration number printed on the declaration is ЕАЭС N RU Д-CN.РА06.В.72974/25. It gives 5 August 2025 as the registration date and 4 August 2030 as the end date. If your importer requests the registration entry, the QR code on the document points to the Russian accreditation register.

On the Russian form, «Заявитель» identifies the applicant and «Изготовитель» the manufacturer. Look in the product description for the model codes. The declaration cites TR CU 010/2011 for machinery and equipment safety and TR CU 020/2011 for electromagnetic compatibility.

The declaration lists GW-440. Our fuel consumption guide covers GW-B440. If your quotation includes the B, send us the full code and the destination country so we can check the paperwork for that model.

The layout drawing for a removable base fuel tank

The model list tells you which generator the declaration names. If you are ordering a removable fuel tank, ask for the layout drawing for the set on your quotation. It shows the crew where to refuel and helps the workshop plan how to get the tank out.

For a rental customer in Honduras, we put the fuel filler on the same side as the control panel and electrical connection box so the crew could reach all three in tight spaces. The 100 kW, 60 Hz, 120/208 V set has a removable stainless steel inner tank and forklift pockets at the front and side for moves between jobs. The customer planned to use it at mining sites and for emergency power in remote areas.

GOODWIND diagram of a removable base fuel tank above three workshop photos of the frame and tank
Below the illustration, the workshop photos show the empty base frame, the separate fuel tank and the tank seated in the frame, from left to right.

When reviewing the drawing, check which panels or pipe connections the mechanic needs to remove first. Allow space for the tank to come all the way out in the direction shown.

Agree the capacity and connections on the tank drawing

Our GW-B440 fuel and runtime guide gives a separate example. The sound-attenuated GW-B440 has a nominal tank capacity of 700 L. To plan fuel deliveries, use the litres available between filling the tank and the next refuelling point, together with fuel consumption at the expected load.

Rectangular generator fuel tank with fittings visible on the top and end faces
The tank body before installation. The connection drawing identifies the purpose and position of each fitting for the ordered unit.

On the tank drawing, check the material, fuel supply and return connections, filler, vent and level indicator. If the site uses an external fuel supply, agree who will provide it. Keep the approved drawing revision with the fleet record so the depot can identify the right replacement tank.

Drawings for a separate ATS cabinet

A standby power order can also include a separate automatic transfer switch (ATS) cabinet. Give the cabinet its own line on the quotation, with its model, voltage, frequency, rated current and number of poles. Use that model to request the cabinet’s single-line diagram, outline drawing and applicable conformity documents.

Closed transfer cabinet with three analog meters, a central display and two indicator lamps on the door
Cabinet front. Three meters, the display and the indicator lamps are visible with the door closed.
Open ATS cabinet with the switching assembly inside and control wiring on the back of the door
Cabinet interior. The switching assembly is on the left and the door-mounted controls are on the right.

Access to the cabinet and its controls

In a narrow electrical room, check the door swing and cable entry on the floor plan. Can an operator standing in the aisle see the meters and indicators? If the control room also needs to see which source is supplying the load, include that feedback signal in the controls schedule.

Drawings and transfer tests

On the single-line diagram, trace the normal supply, generator supply and outgoing load. Check the neutral arrangement against the project design. The cabinet outline drawing shows where the cables enter and how much space to leave around the enclosure.

If the tender sets a time limit for restoring power, agree when timing starts and what counts as power restored. A test can record the mains failure, engine start, voltage and frequency reaching the required values, and transfer of the load. Switch operating time covers only the switching step. Our generator and ATS interface guide explains the start request, transfer command and position feedback.

A document checklist for your bid and handover

Use the factory’s legal name for supplier registration, the full model code on the order and the serial number on the test report. At handover, that serial number should match the set you receive.

Bid or order itemRecord to request and what to check
Supplier approvalChoose the SGS certificate for the requested management system. Copy the legal entity, assembly scope and certificate number into the supplier form.
Generator modelRecord the complete designation from the offer. Include the matching model annex or declaration for the destination and the documents specified in the tender.
Removable fuel tankAttach the accepted tank drawing to the order. Record the agreed material, usable fuel volume, connection positions and service clearance.
Separate ATS cabinetList the cabinet designation and the revision of the single-line diagram. Agree the control signals, the required functional checks and who will witness them.
Unit acceptanceIf testing is specified, agree the load steps, duration, measurements and acceptance criteria before the test. Identify the delivered generator by serial number on its report.

Our manufacturing and quality page shows the assembly and inspection process and the parameters discussed for testing, including output voltage, frequency, current and power. A customer who needs a witnessed load test should specify the operating duty, desired load points and witness arrangements at quotation stage. At handover, check that the report identifies the unit and the conditions under which the readings were taken. A separate site test can then address how the generator, cabinet and building load work together.

When the quotation changes, keep its revision number with the drawings it affects. A different canopy may move the fuel filler or restrict service access. A replacement ATS cabinet needs its own drawings. A new generator model needs another check against the model annex or declaration.

Request a document check for your generator quote

Send us the full generator model or quotation number, the destination country and the document clause from your tender. If you are still choosing a model, tell us the power, voltage and frequency you need. Mention a separate ATS cabinet or a custom fuel tank so we can check its documents as well.